
Most of the dirt is now in place and spread out in preparation for pouring the slab. The plumbing that goes into the slab is now in place.

This view is from in front of the house looking toward the garage & kitchen side.
Notice the pipe in the corner—that's the waste pipe for the powder room on the first floor.

This is standing in the stairs looking towards the downstairs bathroom.

This is near where the fireplaces (outside and living room) will go and is the waste and supply line for the kitchen and master bath.

This shot is taken back toward the garage from the downstairs bathroom.

This is the front porch and expanded area of the shop also taken from the downstairs bathroom.

Those pipes are supply lines and drain for the vanity in the downstairs bathroom.

Here the shower is on the right and the commode and laundry plumbing is on the left for the downstairs bathroom.

Here's the back corner of the shop filled in and ready to pour.

This view is from the front edge of the front porch looking towards the water.