
The city has just finished their inspection and we are now ready to pour the slab.

They have blocked out for the elevator shaft because it has to be deeper.

This will be the entrance to the shop area under the front porch.

Here's an extra strong foundation for the fireplaces.

Here you see the expanded footer toward the back porch.

This is an additional footer for extra strength on the east end of the shop.
Here's some of the plumbing for the downstairs bathroom.

Here are some column footers and the wooden form for the back porch. You can see my shadow while I took the picture.

This is the shower side of the downstairs bathroom and the back part of the shop beyond.

This is one of the footers for the back porch columns.

This is the footer for the corner column on the back porch near the downstairs bathroom.

Notice the plumbing cleanout in the back of the shop.

The water main is in the pipe on the right, and the sewer outlet is on the left.

The wooden form is where the garage door for the shop will go.

This wooden form marks the garage entrances on the west side of the house.