
Head mason Wayne Champagne sets a corner block on the back porch by the fireplace.

Here I'm looking toward the elevator shaft, closer in is a storage room, and closer still the area for the stairs up to the kitchen.

This is the area for the stairs up to the kitchen from the doorway into the garage.

Here's the back corner of the garage. They're working on the angled walls.

This is the back corner of the shop (toward the water).

This is the section shown above from the east side. The elevator shaft is in the
foreground then storage then the stairwell to the kitchen, then another stroage area in the garage.

Here's the corner block for the fireplace going in, and the water side of the garage behind it.

Here you can see the angle cuts on the block forming the water side of the garage.

Wayne puts in a future electrical outlet.

One of the masons is using a wetsaw to cut block for the angles required by three of the four corners of the house.

Freshly mixed mortar is taken to the mortar boards where the blocks are being laid.