The masonary walls are getting finished!



The east side of the garage is now done.



Work continues on the elevator shaft (where you see the wet mortar lines) and on the storage area to the right.



The door from the shop to the back porch is finished, but the door casing is too short and those blocks will have to come out.



The shop as seen from the back porch. The door casing will be knocked out and raised.