
As they build the chain wall, the masons put these metal frames between every other course of cinder block for extra strength.

We've had many rain delays. Here the rain puddles around the footers.

The downstairs bathroom begins to take shape.

This view is from behind the shop looking through the house toward the front.

Here's a picture of the driveway after it has been repaired a second time.
This time the road is blocked off until the road bed hardens. I got
stuck here before.